Automatic CNC Torsion Spring Coiling Machine (Manufacturer)
Features
Equipped with the computer-controlled system imported from Taiwan and servo motor imported from JapanA precious inspection tracer device is installed; it will stop working automatically when the unqualified product is foundThe parameters such as major diameter and angle can be modified at any time according to the working status displayed on the fluorescence screenIt is suitable for producing double torsion spring, straight spring, pagoda-shaped compression spring, rectangle spring, swirl spring and other different spring and special-shaped spring.Specification
wire diameter | 0.5-2.0mm |
Max.O.D. | 45mm |
Max Production Speed | 300pcs/min |
Feed Length | Unlimited |
Feed Speed | 1550m/min |
Feed (Y)Axis(kw) | 2.7kw |
Cam (Y)Axis (kw) | 2.7kw |
Machine Dimensions | 90*85*160cm |
Wooden Case Dimensions | 110*110*160cm |
Machine Weights | 1000kgs |
Gross Weighs | 1100kgs |
Power | 220V 3P 50/60Hz |
How to place the order
Show us the drawing or picture of your samplesProvide the suitable machine as per your detailed requirementWork out the competitive price for youMake a proforma invoiceArrange the mass production after receiving your 30% paymentShip the goods about 10 days after receipt the whole paymentFollowing your goods until you receive them and satisfy with the qualitySamples
Operating mechanism maintenance
Turn off the power.In the use cotton fabric cleaning organization and the radio station the thing, and spreads guards against rust the thin oil.Slide precision slide object, do not use high-viscous oil, using only the slide oil lubrication, so as not to affect the linear movement of the slide. Every six months separately to organization on 1-4 Yellow glib increase bearing grease. Note: Do not use the air spray gun cleaning song hand and slide, in order to avoid the debris, dust and slide chute or the clearance of the rotary structure.Gear-driven lubrication system
Gears lubrication of the system is divided into x and y axes, and the oil tank is just touching the tooth surface. Oil is not much more, so as to avoid motor oil and fuel tank for 6 months to check 1 timesEvery six months, the replacement cycle oil maintenance, and implemented in accordance with the following steps: Note: The new machine using the full 1000 hours, please be sure to update the new cycle oil.
Wire feeding system
To maintain the cleanliness of feeding servo motor to prevent oil and gas, and dust fall into the servo motor or encoder, resulting in mechanical damage.At least every six months for maintenance, or in accordance with the number of machine production, and replace the line feed operation at the same time.
Automatic CNC Torsion Spring Coiling Machine (Manufacturer)