Ads by Google
Throughput rates are valid only if the silo design and silo cone fiuid-isation are carried out correctly.
Throughput rates are based on Portland cement having a bulk density of 1.13tlm3.To obtain the above throughput rates a con-stant and even material flow from the silo is required.
screw feeders for cement &filler dust