AAC Technological Flow of Production of Autoclave Aerated Concrete
1. First,dose and match measured raw materials;
2. After distributing,feed raw material into pouring mixer to make slurry;
3. Through thoroughly mixing,theslurry is poured to mould;
4. After pre-curing under a certain temperature and time, the block would reach a certain hardness prepare for cutting;
5. Tilting hoister would ture over 90 degrees of mould.
6. Then open the mould and scparete it from block.And take the block with side plante to the cutting cart;
7. The blocks then be cut throught the cutter firstly of two vertical sides of block;
8. Secondly the horizontal cutting;
9. Finally the vertical cutting;
10. After cutting,the block is hanged to trolley with side plate by semi-finished product hoister;
11. Organizing the cut blocks and put them into autoclave;
12. Hardeening the block under certain temperature and pressure;
13. Take finished products out of autoclave;
14. The finished product hoister take the finished product to stock shield;
15. Packed for loading;
16. The side plate return back by side plate roller;
17. Side plate would be organized with open mould;
18. Clean the mould and preparing for next pouring;
19. Steel bars processing line for slab production.