Steel door & window frames is made by our machines.
The shape on the picture is just for reference, and we can produce according to your drawings.
1.Quality requirment:
1).All of rollers' surface should be painted with hard chrome.
2).The surface of formed sheet should be flat and straight without scratch.
3).The formed sheet should accord with GB/T 12755-2008.
2.Terms of payment:
30% deposit is required by T/T within ten-business days from the contract signing date.
70% is required by T/T prior to ship equipment from our factory.
3.Test material
1), It is the responsibility of the client to provide us with sufficient testing panel to china for testing at
least 30 days prior to ship equipment from our company.
2), All costs relation to the local transport, customs clearance and local taxes for the sample material will be
paid by the customer.
4.Service after sell:
1).In correct operation & maintaining,the machine is guaranteed for one year since leaving our factory
excluding the electric elements.
2).If necessary,MWIN company will dispatch a technician to the factory abroad to install & regulate the
machine with USD 50/day. The buyer should assist MWIN to get the chinese technician's visa and
should pay for the round trip air ticket and the local accommodation.
5.We can also design and manufacture according to customer's requirement.
Steel door &window frames forming machine