Welcome to ECVERY
drilling rig
drilling rig
Supplier Info
[China Supplier]
Contact Person : Ms. tianwei tworks
Tel : 86-731-83209466
Fax : 86-731-83207813
Product Detail
Drilling Rig for bore pile KL series: new generation, multi-functional piling machinery.

Drilling Rig for bore pile KL series are new generation of multi-functional piling machinery, which can be equipped with:

1.power head, the bored pile drills can finish cast-in-place concrete CFG pile and grouting piles driving by anger rig.

2. Vibrating hammer. Compression device can finish cast-in-place concrete piles, expanded piles with immersed tube.

3.hydraulic static pile or diesel pile. Can do precast piles and prestressed Piles.

4.Three-axises power head for underground continuous wall construction

5.Lifting tools for uplifting piles

Our big model can drill hole specified with diameter of 1000mm. The following are their Main Features of Structure Design:

 1. The column is foldable. The complete appliance can attached with towing device to be transported from different construction sites.

2. The power head system uses three-ring  reducer mechanism, with great weight bearing capacity, and reliable in use.

3. The side adjustment mechanism can work independently to adjust the verticality of the column.

4. Spiral vane of the drilling rod uses high quality carbon steel 16Mn, which is hard-wearing, good in strength. The bit inlays carbide blades to drill faster than normal.

5. The main windlass uses reducer with greater reduction ratio, which is simple in structure but good in the rope-arranging work.

 The above design has several Advantages as below: 

1.Crawling mechanism and walking mechanism can be ex-changed.

2.The column can be adjusted from two sides to ensure verticality of the drilling hole.

3.drilling and piling at the same time. Improves the efficiency of drilling holes and shortens the time of the project.

4. No noise, no vibration, no pollution and good quality of drilling holes.

5. Accuracy and convenience in position by up and down the column

6.Operation systems like electronic system, hydraulic system, monitor system are all gathered in the operation room for comfortable and convenient operation.

The products are widely applied in both civil and industrial construction work of foundation piling for urban constructions, railway, deep excavated retaining projects etc. And their There are two types due to different movement methods, crawler type KLU and walking type KLB, thus could be adopted in different geological conditions, and different foundation construction methods.

drilling rig

Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.