Welcome to ECVERY
1250mm High Output Hot Dip Continuous Galvalume Line
1250mm High Output Hot Dip Continuous Galvalume Line
Supplier Info
[China Supplier]
Contact Person : Mr. li yijun
Tel : 0086-21-60869209
Fax : 0086-21-60869259
Product Detail
Galvalume Strip Line(GL) is made by cold rolling stip after hot-dip plating. (galvalume line,coating galvalume equipment)

hot dip continuous galvalume line

1.description for the hot dip galvalume line:

This kind of strip has excellent corrosion resistance and it is used widely in the world, it replace galvanized strip. Aluminium strip has merits of corrosion resistance of air and oxidation resistance, the galvanized strip has the merits of electrochemical protection. GL strip has merits of aluminium strip and galvanized strip.

2.Technology Parameter for the hot dip galvalume line:1)process method:American- steel – union2)material: cold rolled carbon structure steel, qualified carbon structure steel and low alloy steel roll3)steel type: 08AL,SPCC,SPCD ,SPCE4)layer condition: normal spangle, small spangle, skin pass spangle5)layer weight: GI:B/T2518-886)thickness range(two side): 120g/m27)layer control method: air knife8)treatment after galvanized: skin pass, stretch,  anti-fingerprint coating/chromate coating9)continuous annealing furnace: horizontal/vertical , electricity, natural gas, coal gas, etc10)zinc pot: main frequency induction heating ceramic zinc pot11)skin pass: four-tandem, bottom support roller AC frequency driving12)tension leveler: single bending & single stretching /double bending & single stretching/two bending & 13)two stretching, elongation among 0.5~2.0%14)driving control: main drive adopt SIEMENS AC complexor frequency control system15)quality standard: GI:B/T2518-2004 Process Flow for the hot dip galvalume line:Manually loading →entry coil car → No.1,No2 pay-off reel →No.1,No.2 double-rolls pinch →

No1,No.2 shears → welder →No.1 bridle roll →No.1 entry looper →No.1 CPC →

No. 2 bridle roll → No.1 roll brushing machine →electrolytic degreasing →No.2 brushing machine →

 degreasing →No. 3 brushing machine →No.1 water washing →No.4 brushing machine →No.2 water washing No.2 CPC→No.1 air drying device →deflector roll →No.3 CPC →No.3 bridle →No.1 tensiongauge roll →preheating furnace → heating furnace →soaking furnace →furnace throat → cooling furnace →hot bridle→furnace nose →zinc pot air knife →cooling tower →No.4 CPC →horizontal air cooling →No.2 deflector roll →vertical air cooling →water cooling tank →No. 2 air cooling →No.4 bridle →skin pass→ levelers→No.5 bridle→fingerprint proof or chromate drying →No. 2 exit looper →No.5 CPC →No. 6 bridle →electrostatic oiling →pinch roll →No.3 shear →double-rolls pinch →coiler→manually unloading

1250mm High Output Hot Dip Continuous Galvalume Line

Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.