Welcome to ECVERY
eccenetric overburden rock drill spare parts
eccenetric overburden rock drill spare parts
Supplier Info
[China Supplier]
Contact Person : Ms. Peng Lu
Tel : 0011-61-0449691665
Fax : 86-0738-8688086
Product Detail
overburden drilling 1.efficient energy transfer 2.faster drilling speed 3.lower oil consumption 4.longer life,less failure

eccentric overburden drilling equipment:

1. 10 years manufacturing experience;

2. Certificate: ISO9001:2008

3. Material: Carbide

Eccentric Reamer System Step-by-step

1. When drilling starts, the reamer swings out and reams the pilot-hole wide enough for the casing tube to slide down behind the drill bit assembly.

2. When the required depth is reached, rotation is reversed carefully, whereupon the reamer swings in , allowing the drill bit assembly to be pulled up through the casing.

3. Casing tubes that are to be left in the drill hole should be sealed at the bottom of the hole by means of cement grout or some other sealing agent.

4. Drilling continues to the desired depth in the bedrock using a conventional drillstring.

NOD165 Eccentric Overburden Drilling Equipment

1

Casing Tube

Maximum O.D.: 195mm

Minimum I.D.: 182.6mm

2

Drill Pipe

Connection Thread: API3 1/2”Reg

O.D.: 114mm

Wrench Flats: 95mm

3

Guide Sleeve

Effective length: 225mm

4

DTH-Hammer

HD65, Cop64, SD6, DHD360, QL60

5

Casing Shoe

L3=95mm L4=55mm D3=181.5mm D4=166mm

6

Guide Device

L1=61.5mm L2=181.5mm D1=165mm D2=178mm

7

Reamer

D5=164mm L5=79.5mm

Reaming Diameter: 211mm

Reamer has 7*14mm buttons

8

Pilot Bit

D6=165mm L6=82.5mm

Gauge button: 8*16mm

Face button:8*16mm

Technical Data

eccenetric overburden rock drill spare parts

Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.