Welcome to ECVERY
eccenetric overburden stone air drilling tools
eccenetric overburden stone air drilling tools
Supplier Info
[China Supplier]
Contact Person : Ms. Peng Lu
Tel : 0011-61-0449691665
Fax : 86-0738-8688086
Product Detail
overburden drilling 1.efficient energy transfer 2.faster drilling speed 3.lower oil consumption 4.longer life,less failure

eccentric overburden drilling equipment:

1. 10 years manufacturing experience;

2. Certificate: ISO9001:2008

3. Material: Carbide

Eccentric Reamer System Step-by-step

1. When drilling starts, the reamer swings out and reams the pilot-hole wide enough for the casing tube to slide down behind the drill bit assembly.

2. When the required depth is reached, rotation is reversed carefully, whereupon the reamer swings in , allowing the drill bit assembly to be pulled up through the casing.

3. Casing tubes that are to be left in the drill hole should be sealed at the bottom of the hole by means of cement grout or some other sealing agent.

4. Drilling continues to the desired depth in the bedrock using a conventional drillstring.

NOD240 Eccentric Overburden Drilling Equipment

1

Casing Tube

Maximum O.D.: 273mm

Minimum I.D.: 260.4mm

2

Drill Pipe

Connection Thread: API3 1/2”Reg

O.D.: 114mm

Wrench Flats: 95mm

3

Guide Sleeve

Effective length: 343mm

4

DTH-Hammer

HD85, Cop84, SD8, DHD380, QL80

5

Casing Shoe

L3=110mm L4=65mm D3=259mm D4=241mm

6

Guide Device

L1=70mm L2=190mm D1=240mm D2=256mm

7

Reamer

D5=238mm L5=100mm

Reaming Diameter: 308mm

Reamer has 14*16mm buttons

8

Pilot Bit

D6=240mm L6=89.5mm

Gauge button: 12*16mm

Face button:18*16mm

Technical Data

eccenetric overburden stone air drilling tools

Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.