Welcome to ECVERY
eccenetric overburden rock air drilling tools
eccenetric overburden rock air drilling tools
Supplier Info
[China Supplier]
Contact Person : Ms. Peng Lu
Tel : 0011-61-0449691665
Fax : 86-0738-8688086
Product Detail
overburden drilling 1.efficient energy transfer 2.faster drilling speed 3.lower oil consumption 4.longer life,less failure

eccentric overburden drilling equipment:

1. 10 years manufacturing experience;

2. Certificate: ISO9001:2008

3. Material: Carbide

Eccentric Reamer System Step-by-step

1. When drilling starts, the reamer swings out and reams the pilot-hole wide enough for the casing tube to slide down behind the drill bit assembly.

2. When the required depth is reached, rotation is reversed carefully, whereupon the reamer swings in , allowing the drill bit assembly to be pulled up through the casing.

3. Casing tubes that are to be left in the drill hole should be sealed at the bottom of the hole by means of cement grout or some other sealing agent.

4. Drilling continues to the desired depth in the bedrock using a conventional drillstring.

NOD280 Eccentric Overburden Drilling Equipment

1

Casing Tube

Maximum O.D.: 324mm

Minimum I.D.: 305mm

2

Drill Pipe

Connection Thread: API4 1/2”Reg

O.D.: 114mm

Wrench Flats: 95mm

3

Guide Sleeve

Effective length: 305mm

4

DTH-Hammer

SD10, NUMA100

5

Casing Shoe

L3=125mm L4=75mm D3=304mm D4=281mm

6

Guide Device

L1=97mm L2=254mm D1=280mm D2=303mm

7

Reamer

D5=266mm L5=120mm

Reaming Diameter: 378mm

Reamer has 22*18mm buttons

8

Pilot Bit

D6=280mm L6=135mm

Gauge button: 12*18mm

Face button:27*16mm

Technical Data

eccenetric overburden rock air drilling tools

Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.