Welcome to ECVERY
Non-shrink grouting materials
Non-shrink grouting materials
Supplier Info
[China Supplier]
Contact Person : Ms. Zhang Susan
Tel : 86-010-60557306
Fax : 86-010-60557308
Product Detail
It can rapid-hardening,self-leveling,reinforce the equipment.

Polar Bear Non-Shrink grouting material is blended through a special procedure by specially selected cementitious material, carefully selected fine aggregate and admixture. It owns the characteristics of high flow, non-shrinkage, early strength and high strength. Functionally they are divided into two categories include four products: High strength -I,-II; Extra early strength-I, -II

Properties:

Double expansion in plastic and hardened state, compensate the dry shrinkage, ensure the fixed combination between steel-back plane and concrete base, efficiently transmit the load carrying into the base.High early strength: this material is obtained by special cement as its basic material, it is suitable for urgent repair and accelerators construction under negative temperature environment.High fluidity.Easily used, only mixed with water on site, easily pumped.Durability: High final strength, excellent impermeability and corrosion resistance, ensure accuracy of equipment setting.Working environment: this material can be operated in a negative temperature environment with a rapidly increased strength.

7. Non-chloride: no harm for equipment or armature reinforcement.

Technical Data

 (test in standard lab)

Name

HS-I

HS-II

EES-I

EES II

Grain size

4.75mm/%

<2.0

Setting time(min)

Initial

≥120

≥45

Bleeding capacity/%

<1.0

Fluidity /mm

Initial

≥260

30min

≥230

Compressive

(Mpa),≥

4h

-

-

30

-

12h

-

-

-

10

1d

35

22

50

45

3d

55

40

55

55

28d

80

70

70

70

Height change %

1d

 

 

Bond strength

 (MPa)

28d

≥4.0

Erosion to armature

 

none

W/C

 

0.15

0.16

0.12

0.15

Operating temperature

≥5°C

≥-5°C

Uses:

1. Heavy equipment, High precision grinder.

2. Erection Engineering of Structural steel.

3. Grouting to column foundation, pile foundation and Rock foundation to fixation.

4. Anchoring of frame structure joint.

5. Repair to the honey-comb and holes of reinforced concrete structure.

6. Repair & Reinforcement to concrete structure.

Non-shrink grouting materials

Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.