Ads by Google
1.The raw materials:waste tires, plastics and oil sludge2.Total Capacity:5 tons/day,10 tons/day.,20 tons/day 3.the size of reactor:2.2*6m, 2.6*6.6m4.Average oil productivity:diesel oil: 40%, gasoline:5%, heavy oil: 10% 5.Average carbon productivity:30%6.Average steel productivity:10%7.Average gas productivity:5%8.The decompose temperature:maximum temperature is 500 degree Cm 9.Pyrolysis time:8 hours10.Discharging time:4 hours11.Feed in time:1 hour12.Reactor depth-ratio:3/4 13.pyro-gas composition:C1-C3614.Design pressure:7 Pa15.Actual pressure:0.02 Pam
crude oil&carbon black extracting equipment