Welcome to ECVERY
tyre cutting machine
tyre cutting machine
Supplier Info
[China Supplier]
Contact Person : Ms. li Lark
Tel : 86-370-3337890
Fax : 86-370-3337890
Product Detail
1:CE and National certificate 2:Pollution-free and installation for free 3:Stable safety measures 4:High oil yielding rates

Main Models Specifications

The brief introduction of five main models

LN-2200*6000  per batch 5tons whole tyres, 3batch 2days.

LN-2200*6600  per batch 5tons whole tyres, 3batch 2days.

LN-2600*6000  per batch 8tons whole tyres, 1batch 1day.

LN-2800*6000  per batch 10tons whole tyres. 1batch 1day.

LN-2800*6600  per batch 12tons whole tyres. 1batch 1day.

 The whole batch time:

Model

Feeding time

Processing time

Cool time

Discharge time

total

2200*6000

2hours

7-8hours

2hours

2hours

14hours

2200*6600

2hours

8-9hours

2hours

2hours

15hours

2600*6000

3 hours

10-12 hours

3 hours

3 hours

21 hours

2800*6000

3 hours

12-14 hours

3 hours

3 hours

22 hours

2800*6600

3 hours

14-15 hours

3 hours

3 hours

24 hours

The end product percentage are as follows:

 No

Name

percentage

1

Tyre oil

45%

2

Carbon black

35%

3

Steel wire

10-12%

4

Waste gas

8-10%

 Machine total motor and work Power

No

Model

Fun

Speed reducer

Water pump

Oil pump

Total  power

1

2200*6000

4KW

3KW

1.5KW

1.5KW

11kw

2

2200*6600

4KW

3KW

1.5KW

1.5KW

11kw

3

2600*6000

7.5KW

5.5KW

1.5KW

1.5KW

16kw

4

2800*6000

7.5KW

5.5KW

1.5KW

1.5KW

16kw

5

2800*6600

7.5KW

5.5KW

1.5KW

1.5KW

16kw

Safety System

One water sealing tank to stop the fire coming back to the oil tank;

Three temperature meters and temperature meters, three safety valves on the reactor door, the oil separator tank, the water sealing tank.

One control cabinet, to give alarms when temperature or pressure has any wrong. If not person release the gas for long time after the alarm, the safety valve will release by itself.

 Delivery time:

For LN-2600-6000 and LN-2800-6000, the delivery time is within 25days after the advance payment (30% of the total amount).For the smaller model, LN-2200-6000 and LN-2200-6600, the delivery time is 20day.

 Warranty and machine life:

We guarantee the complete machine one year since installation. If in the first one year, there is any problem caused by the machine quality, we take responsibility. We guarantee the reactor life more than 4 years, others parts no need change. We provide the whole life machine maintenance.

Environment Protective:

Dispose waste gas, liquid, and residua in the process:

1.  Waste gas: Transferred through two safety device: wat er close burning air nozzle. Fully burnt, not only eliminated pollutant but also minimized the quantity of fuels. For smoke dust discharge, we apply series machines of ZTC Desulphurization and dust remover which could control the smoke dust discharge amount meet relative standards of GB-2001.

2.  Waste liquid: Produced waste acidic water in the process of oil disposing (50kg process from 1 ton of oil easy to process for small quantity). Counteract the liquid by alkalescent liquid solution. After three stage of filtration, the litmusless waste water was introduced to evaporator(use the heat of the flue of main processor as its heating resource)

3.  waste solid :The residua left after the catalyst splitting of tyre is black carbon. No waste is solid exist.

tyre cutting machine

Related Products
Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.