Welcome to ECVERY
Shenglong High Pressure Injection packers for grouting
Shenglong High Pressure Injection packers for grouting
Supplier Info
[China Supplier]
Contact Person : Mr. yanjin lin
Tel : 0086-21-51860079-813
Fax : 0086-21-68060355
Product Detail
SL Water-Sealing needles, Injection packers 1. Hard 2. No skidding 3. Inject PU & Epoxy

High pressure injection packers for waterstop

 Features

High pressure injection packers for concrete crack repairs , waterproofing ,rehabilitation of concrete structures , basement leak sealing cracksealing etc.

Shenglong injection packer for injection machine spare parts is uesd with the Shenglong injection machine in concrete crack repair and water leaking stop. It suits for both polyurethane and epoxy injection.

Method of Construction for Injection

1.Crack and leakage condition inspectionCheck the process procedure after finding the thickness, width and depth of crack and leakage condition of the structure

2.Drilling OperationDrill directly into crack section if the thickness of concrete is thinner than 10cm. For the thickness of 10~50cm, drill it with 45 degree angle by keeping a distance of 1/5 of concrete thickness. Make sure it penetrates the crack section. If the thickness is over than 50cm, keep the distance of 20~30cm and drill it with 45 degree angle until it penetrates crack section. And keep drilling by maintaining the fixed interval. (5 holes per 1 meter. Drill it in zigzags)

3.Packer InstallationClean the inside of drilled holes with compressor. Make sure that rubber sleeve of packer and cutting line of tightening nut should be put into the inside of concrete surface when installing. Tighten the packer completely by using the T-box. (Packer might be damaged if you tighten it too strongly)

4.Injection OperationInject the waterstopping material by using the high pressure device or grease gun.  Maintain the initial injection pressure as around 40kg/cm and increase the pressure by each 10kg/cm gradually until the waterstopping material flows out from crack section. Water will come out from the crack section first and then waterstopping foaming agent and then water stopping liquid at last. If the waterstopping material that is not foamed comes from the crack section, then move to next packer for injection.

5.Packer Removing OperationRemove and break the packer by using vise pliers or hammer as a tool. If there is still a wet section, then inject the water stopping material again.

6.Finishing OperationRemove the water stopping material that is remained on the crack section. Spreading with the elastic sealing material.

Model Specification(diameter*length) SL-8      14mmx80mm SL-10    14mmx100mm SL-15    14mmX150mm SL-20    14mmX200mm SL-25    14mmX250mm

How to use

Above Sealing-Packers are the most common specification( Drill diameter × Length ). Other spcifications can be made by your kindly requests!

  

Contact Person: MandyMobile:+86-139 1737 1510Tel: +86-21-51860079-814  Fax: +86-21-6806 0355

Shenglong High Pressure Injection packers for grouting

Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.