Welcome to ECVERY
CNC Hydraulic Lifting System for Top-to-Bottom Tank Construction; Jacking up System
CNC Hydraulic Lifting System for Top-to-Bottom Tank Construction; Jacking up System
Supplier Info
[China Supplier]
Contact Person : Ms. Gao Macy
Tel : 86-25-52781628
Fax : 86-25-52782618
Product Detail
Hydraulic Lifting System; Jacking up System; Suitable for top-to-bottom lifting of storage tank, tower, etc

Hydraulic Lifting System for Automatic Tank Welding; Jacking up System; Tank Welder

Suitable for industries of: OIL AND GAS, PETROCHEMICAL, NUCLEAR POWER STATION, LNG CARRIER AND TERMINAL, etc.

Reference: Rotary Engineering Ltd., Formosa Heavyinductries Corp., CNPC Group, SINOPEC Group

We provide complete solution for tank welding with different construction method, both bottom-to-top and top-to-bottom tank construction, hydraulic lifting system are especially designed for top-to-bottom tank erection.

Features:

1Suitable for top-to-bottom lifting of storage tank, tower, etc
2

The design lifting capacity of each cylinder is 25T

3

Allowed lifting capacity of each cylinder is less than 18T

Allowed maximum stroke is 2700mm

4

PLC control, easy operation, high synchronicity, high automatization

5

Module design, single cylinder or single group jacking height can be independently regulated. It also can be centralized controlled, effectively reducing labor intensity

6

It can match with our specialized top-to-bottom girth welding machine to realize automatic welding of inside girth seam

7

It realizes mechanical fitting-up, improving construction efficiency

CNC Hydraulic Lifting System for Top-to-Bottom Tank Construction; Jacking up System

Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.