Double-component Polyurethane Waterproof coating
Technical data sheet (GB/T 19250-2003)
No. | Item | National Standard I | National Standard II | |
1 | Solid content %≥ | 92 | ||
2 | Dry time, h≤ | Dry time of Outside | 8 | |
Dry time of Inside | 24 | |||
3 | Tensile strength, Mpa≥ | 1.9 | 2.45 | |
4 | Tear strength, N/mm≥ | 12 | 14 | |
5 | Breaking elongation, (normal temperature),%≥ | 450 | 450 | |
6 | Water impermeability, 0.3Mpa 30min | Impermeable | ||
7 | Bending at low temperature, °C≤ | -40 | ||
8 | Bonding strength of Moist basea, Mpa≥ | 0.5 | ||
9 | Service temperature | -30-80°C | ||
a. It is only required for moist substratum of underground project. |
Year’s production capability: 7,000 MT
Package: Normal export standard packing 20kg, 25kg per metal pail.
Color: Different colors are available
double-component polyurethane waterproof coating