Welcome to ECVERY
walk thru frame scaffolding 1219*1930
walk thru frame scaffolding 1219*1930
Supplier Info
[China Supplier]
Contact Person : Mr. ZHOU Jason
Tel : 0086-532-88202329
Fax : 0086-532-88202907
Product Detail
1,professional manufacturer/ factory 2.have more than 10 years experience 3.in port city 4.design and manufacture for you

walk through frame scaffolding 

Item:1219*1930

Data: 42.7*2.3mm

Weight:19.35kg

lock:fliplock

Surface: HDG,EG,paint, electrophoretic paint

components of assembling

1.Main frame

Insert the main frame into jack base section in per pendicular position

2cross brace

for fixing the main frame in each span of scaffolding

3.Joint pin

insert into the top of main frame for joining the required dimension

4.Horizontal frame or catwalk

It is a lateral pipe frames used for fixing the main frame to complete the first floor scaffolding.it can be erected with about 2 to 4 spans in each high rision floor alternately.

5.jack base

It is a base seat for adjusting and fixing the required scaffolding length above the wooden planks.

walk thru frame scaffolding 1219*1930

Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.