Welcome to ECVERY
Square acrylic steam shower room for two people
Square acrylic steam shower room for two people
Supplier Info
[China Supplier]
Contact Person : Ms. Lee Candice
Tel : 86-20-28944131
Fax : 86-20-81054959
Product Detail
Steam shower room: 1.Room size:1800*980*2150mm 2.With CD player 3.Steam bath 4.5KW 4.Glass and acrylic material

     

Luxurious computerized steam shower Room :

 

 Basic data:

Luxurious computerized steam shower Room

Shape

Square

Opening

Sliding

Glass thickness

6mm

Bottom material

Acrylic

Controller

Computer Control Panel

Brand

Austar

Place of origin

Guangzhou,China

Room size

1800*980*2150mm

Weight

295 kg

Media

CD player

Massage

Back massage

Color

White-off bottom and glass shower room

Volume

2.75 cbm

Package size

1900*1280*670mm;1600*1880*370mm

CONTROLLER :

1.Remote control (Infrared ray)

2.Induction type technology (Capacitance)

3.Steam(3-5 KW Timing constant temperature 3-5KW)

4.FM radio(Self-select and self-locking)

5.Lighting

6.B-Lig

7.Ventilating fan

8.Ozone

9.Telephone (Receive/dial)

10.AUX(External equipment input)

11.Emergency artificial resort

12.Keyboard locking

13.Failure Intelligent Testing Indication

CLEANING:

∞∞Generally,use the cloth which soak by litmusless detergent(light scour,soap and water)can clean the shower cubicle.

∞∞Do not use strong deliquescent substance like strong scour,alcohol,gas,acetone and so on. ∞∞If the smutch is bad and heavy,you can use low consisitency acetum,but must clean by water finally.

INSTALLATION:

 (Tool need:Level gauge,pencil,cross-head screw driver,Iron hammer,percussive drill,tape measure,movable wrench,silicon glue water gun,dimeter 6 aiguille)

STEP1:

∞Put the shower tray on the right place and adjust feet to the level position by level gauge; ∞Please confirm the wasted drainage position

STEP2:

∞Put the movable glass door on the bottom crock,line up the drilling sites of lower track and bottom crock,and fix the movable glass door tightly with 3 ST 4*12 self-tapping screw.

∞Adjust the pulley with screw driver and spanner as shown in the drawing to make the push-and-pull of movable glass door smooth and ensure there is no gas between the two doors when being shut.

STEP3:

 ∞Put two pieces of side glass on bottom crock,line up the drilling sites of side glass and movable glass door ,and those of side glass and bottom crock

 ∞Fasten the side glass and movable glass door tightly with 10 ST 4*12 self-tapping screws.

 ∞Fasten the side glass to bottom crock tightly with 2 ST 4*12 self-tapping screws.

STEP4:

∞Put the functional aluminum alloy on underchassis,line up the drilling sites of side glass and lightening post functional board (aluminum alloy),and fasten the functional aluminum alloy to side glass tightly with 10ST 4*12 self-tapping screws.

STEP5:

∞Place the top cover on booth body and line up screw drilling sites,then connect the top cover with backboard with the use of M6*30 machine screws and M6 nuts(ten for each),and fasten it to the upper track of movable glass door with 5ST 4*16 self-tapping screws

∞Connect the shower head and sole massage to backboard with hose and place them on the designated position of booth body.

∞Connection of water circuit:connect spray nozzle,massage,shower head and top spray nozzle with water faucet separatcly according to the drawing ∞Connection of electric circuit:connect the electric wires according to there colors

STEP6:

∞Link the waterway and circuitry

STEP7:

∞Put the top roof on the shower cover

∞Put thesilicon glue water into the connecting parts of the acrylic back panel ,aluminum down and shower tray ∞Connect the electric power supply well

>Our Deliver Time

3-5 working days if we have store; 7-10 working days if your order is large; All goes according to the practice situation;

>Payment Terms

30% in advance, 70% balance should be paid before delivery Discount: Offer based on order quantities.

More similar steam shower room:

AT-GT9051TV-DVD:

AT-G8201:

 

AT-8202F:

AT-G9050-1 TV-DVD:

 

AT-G0211:

 

Payment:

 

Payment Terms

Payment

30% in advance,70%   balance should be paid before delivery

Lead time

7-15 working days

Port of loading

Guangzhou ,China (Mainland)

Discount

offer based on order quantities.

 

If you want to purchase your appointed steam shower room, kindly inform us,we can make for you according to your request.

Square acrylic steam shower room for two people

Ads by Google

About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.